Product Details:
Payment & Shipping Terms:
|
Product Name: | Investigation 100 Meters Depth Soil Testing Drilling Machine For Exploration Coring | Drilling Depth: | 100 Meters |
---|---|---|---|
Type: | Core Drilling Rig | Drilling Hole Diameter: | 100 Mm |
Power Type: | Diesel | Voltage: | Diesel Engine Driven |
Warranty: | 12 Months | Color: | Yellow,Red And Blue |
After Sale Service: | Video Support | OEM: | Acceptable |
High Light: | 100 Meters Soil Test Drilling Machine,100 Meters soil investigation machine |
Geotechnical Investigation 100 Meters Depth Soil Testing Drilling Machine For Exploration
Product Description
XY-1 drilling rig is a small portable drilling rig with 100 meters depth ,100mm hole diameter ,It is suitable for drilling in reconnaissance, geophysical exploration, road and building exploration, blasting holes and other drilling engineering.Alloy, steel grit and steel drop bits can be chosen according to the different strata.
Product Parameter
Unity machine parameter | |
Drilling depth | 130m |
Max. open hole caliber | 220mm |
End hole caliber | 75mm |
Drill pipe caliber | 50mm |
Drilling angle | 90°~75° |
Drill weight | 560Kgs |
Spindle | |
Spindle speed: | 142,285,570r/min |
Spindle stroke: | 450mm |
Hoist | |
Max. lifting capacity: | 1600Kgs |
Single line lifting speed: | 0.41,0.82,1.64m/s |
Reel caliber: | 140mm |
Tightrope caliber: | 13mm |
Tightrope size: | 27mm |
Mud pump | |
Type: | Horizontal single-urn double action |
Flow Diesel engine/Electric motor: | 95/97L/min |
Max. pressure: | 1.2Mpa |
Work pressure: | 0.7Mpa |
Water inlet diameter: | 30mm |
Water outlet diameter: | 20mm |
Triangle conveyer belt: | B1575mm |
Product Features
1. It improves drilling efficiency and reduces labor intensity With hydraulic automatic feeding mechanism.
2. It can be achieved without stopping to change rods, easy to operate, safe and reliable with ball clip holding mechanism or hydraulic chuck.
3. It has hole bottom pressure gauge to be easy to master the situation in the hole.
4. It also has advantage of Compact structure, concentrated handle, small footprint, light weight, strong decomposition, easy to move. It can be operated in plains and mountain areas.
Applications
1. Drilling construction for high-rise building, highway, railway, bridge, port, harbor work, dam and tunnel;
2. Small-diameter hole foundation piling drilling;
3. Solid mineral exploration;
4. Anchoring engineering for battered slope;
5. Geothermal pipe-installing for heat pump.
What aspects should we pay attention to in the drilling process of water well drilling rig?
Bit plays a very important role in the drilling of water well drilling rig, but the quality of a bit directly affects the efficiency and quality of water well drilling. Therefore, in the selection process, we should pay attention to the selection and use of lower bit. When we are operating the drill bit, we must pay attention to several aspects in order to better production and operation.
1. After the drilling structure of the drill bit of the water well drilling rig is drilled, the central drilling tool needs to be replaced in time. First, the hole bottom needs to be cleaned, and then the residue at the hole bottom needs to be blown away. After the drill bit stops rotating, the drilling tool in the water well drilling rig can be lifted up slowly. When the lifting force is just enough to lift the drilling tool, it is the most appropriate.
2. During the drilling process, the drill bit of the water well drilling rig shall be summarized. It is also necessary to carefully observe the follow-up situation of the casing, timely understand the specific situation in the hole, and keep the hole clean when necessary. Moreover, the drill bit in the water well drilling rig shall not be pulled out by force during the drilling process.
3. Sometimes there will be more residual rock slag at the bottom of the hole of the water well drilling rig, and the rotating part of the eccentric bit will be stuck by the rock slag, which will affect its retraction and production. At this time, it is necessary to transport air pressure, clean the hole again, make the DTH hammer work in a short time, and then lift the central drilling tool again.
FAQ
Q 1: What kind of drilling rig do you have?
A: We mainly produce small hydraulic drilling rig, water well drilling rig, core drilling rig, engineering drilling rig, geological exploration drilling rig, etc., and we will recommend the suitable model according to your exact requirement .
Q 2: Where is the address of your company?
A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province, China
Q 3: Are you a manufacturer or a trading company?
A:We are a 20 years professional manufacturer with ISO certificate. We have a large modern drilling rig plant in Hebei, China.
Q 4: How long is your delivery time?
A: Small hydraulic drilling rigs generally take 5-7 days, and large pneumatic water well drilling rigs generally take 7-15 days. If there is an urgent order, please contact our sales in advance.
Q 5: How long is the warranty of your well drilling rig?
A: Except for consumable spare parts, the whole machine shall be one year.
Q6: How long can your air compressor be used?
A: Normally more than 10 years.
Q 7: What are the terms of payment?
A: TT, Western Union transfer.
Q8, Can you provide us with the documents for customs clearance?
A: Of course. We will send you commercial invoice, sales contract, packing list, bill of lading (FOB or CFR, CIF terms), insurance policy (if CIF terms), and certificate of origin if you need it
Q9: How is your customer service?
A: 24-hour online service. The 48 hour problem was solved (except in special cases).
Q10: How about your after-sales service?
A: 1. Provide customers with online installation and commissioning instructions.
2. Well trained engineers can serve overseas. (non epidemic impact)
Contact Person: Cathy
Tel: 86-13343314303
Fax: 86-0311-84397208